Confederation Line LRT Project – NetSpire Passenger Information System

Summary

The Confederation Line LRT project involved the design, supply, and integration of a cutting-edge NetSpire Passenger Information System to improve passenger communication and operational efficiency. This included the installation of 116 double-sided LED Passenger Information Displays and an IP-based Public Address System integrated with third-party signaling, SCADA, and fire safety systems.

The system was designed with dual redundancy for reliability and complied with the Accessibility for Ontarians with Disabilities Act (AODA) to ensure inclusivity. Tailored acoustic designs enhanced audio clarity across stations, while comprehensive training programs prepared staff for efficient system operation. Delivered as part of a $2.1-billion Public-Private Partnership, the project was completed on time and on budget in 2019, reflecting a strong focus on innovation and seamless execution.

WhereCanada
When2019
Project TypeInformation System Implementation
SolutionsPassenger Information System, Public Address System, Third-Party Integration

Functional Highlights

  • Passenger Information Displays:
    116 double-sided LED displays providing real-time travel updates and alerts for passengers on station platforms.
  • Public Address System:
    Integrated IP-based system ensuring clear and consistent audio announcements across all stations and public areas.
  • Accessibility:
    Fully compliant with the Accessibility for Ontarians with Disabilities Act (AODA), providing inclusive communication for all passengers.
  • Redundant System Design:
    Dual redundant architecture to ensure uninterrupted system performance in case of component failures.
  • Third-Party Integration:
    Seamless interfacing with signaling, SCADA, and fire safety systems to optimize operations and safety.
  • Station Acoustic Design:
    Tailored public address acoustic designs for enhanced audio clarity in complex station environments.
  • Comprehensive Testing:
    Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) performed to ensure quality and functionality.
  • Training Programs:
    Extensive training for system maintainers and operators to ensure smooth handover and ongoing operations.
  • Revenue Service Integration:
    Final testing and system readiness for seamless transition into revenue-generating operations.
  • Long-Term Support:
    Post-implementation support and system maintenance to ensure longevity and reliability.
  •